The Vertical Barrier Experts
 

Structural Steel Erection
This structure was custom built to match the existin solar guards on the upper floors of the Redwood City Courthouse
Job descriptions and benefits

The project began with the removal of the existing chainlink fence.
Recycled material was utilized to manufacture the structure.
A seamless gate was built into the structure.

ALTERNATE VIEW

ALTERNATE VIEW
   
   
   
   
   
   
   
   
 
217 OLD COUNTY RD. • STE 3 • SAN CARLOS, CA • 94070